Michigan State University
East Lansing, Michigan
Project Responsibilities For Matrix
Electrical Engineering
Lighting systems upgrade
Reconfiguring of power distribution
Mechanical Engineering
Upgrade of HVAC systems
Plumbing renovations
Expansion of Building Automation Systems
Commissioning
Commissioning of new and existing HVAC & Lighting systems
Duffy Daugherty Building: Project consisted of a complete commissioning of the 250,000 square foot existing building. The mechanical system consisted of chilled and hot water air handling units. Some of the air handling units were single zone and other ones served a VAV system.
The detailed evaluation of the HVAC systems found many items that were able to be fixed to make the system more energy efficient and provide much better space temperature control. By using 16 temperature and humidity data loggers we were able to verify the temperature difference before and after commissioning.
The Wharton Center: Project consisted of a complete commissioning of the 530,000 square foot existing building. The mechanical system consisted of chilled and hot water air handling units. Most of the air handling units were single zone. The detailed evaluation of the HVAC systems found many items that were able to be fixed to make the system more energy efficient and provide much better space temperature control.
Matrix also evaluated the electrical system to enhance the lighting system and save energy. By tracking the energy usage before the commissioning process we were able to verify the energy savings before and after commissioning.
Spartan Stadium: Project consisted of a complete commissioning of the 425,000 square foot existing building. The mechanical system consisted of chilled water and hot water air handling units. The detailed evaluation of the HVAC systems found many items that were able to be fixed to make the system more energy efficient and provide much better space temperature control.
Matrix also evaluated the electrical system to enhance the lighting system and save energy. By tracking the energy usage before the commissioning process we will be able to verify the energy savings before and after commissioning.