Back to top

CATA Facility

Matrix provided mechanical and electrical engineering for the Lansing CATA Facility, the project consisted of a complete new mechanical system consisting of a heating system, make up air system, oil burning system, carbon monoxide/hydrocarbon detection system, and pressure controls for the existing 64,000 square foot bus garage. Complete upgrade of the lighting was also completed with energy efficient lights. A design was also completed for the existing two story attached office facility to maintain a positive pressure between the office space and the bus area to prevent fumes from getting into the office space.

A new 45,000 square foot bus garage was also added to the existing bus garage that required a new HVAC system, plumbing, fire protection, power, lighting and controls system.

Allegan Transportation Facility

Matrix provided mechanical and electrical engineering for Allegan Transportation Center, the building consists of office space, maintenance area, indoor vehicle wash space, indoor vehicle storage and a paved parking lot for employee and customer parking. In the office area we provided a power design, lighting design, plumbing design, heating and cooling design for the space. The maintenance bus storage area has lighting, plumbing, oil separation, heating and cooling along with carbon monoxide/hydrocarbon detection system. The total area of the building is 20,500 square foot.

Alma Transportation Facility

Matrix provided mechanical and electrical engineering for Alma Transportation Center, the building consists of office space, indoor vehicle storage and a paved parking lot for employee and customer parking. In the office area we provided a power design, lighting design, plumbing design, heating and cooling design for the space. The maintenance bus storage area has lighting, plumbing, oil separation, heating and cooling along with carbon monoxide/hydrocarbon detection system. The total area of the building is 14,600 square foot.