Back to top

Religious Experience

Westlocke Wesleyan Church Addition

Project was a 12,535 square foot addition to the existing church facility location in Williamston, Michigan.

Freeland United Methodist Church

Project consisted of an 11,500 square foot one-story Church with a partial basement and second floor mechanical penthouse. Facility includes a full service kitchen, fellowship hall, 200 seat sanctuary, eight classrooms and a small office area.

Marshall United Methodist Church

Project consisted of the addition of cooling to 6 existing offices, 16 classrooms, rest rooms, and corridors. Also included was the design of replacement heating, ventilating, and air conditioning systems for the existing sanctuary as required for proposed architectural renovations.

St. Mary’s Parish

The project consisted of a 15,355 square foot addition and approximately 5,575 square foot of renovations to the old kitchen/fellowship hall area located in Charlotte, Michigan. The new addition will include multipurpose room, kitchen, parish offices, new gang toilets, and gathering area. The old fellowship hall and kitchen will be converted to religious education, nursery school, and overflow space. Alternative work included consisting of new HVAC for the existing worship space and adding a gable roof structure on the existing school.

Calvary Bible Church Building Addition

The project consists of a 37,000 square foot two story addition that connects the existing Chapel to the existing multi-purpose building located in Ypsilanti, Michigan. The addition includes a new library, kitchen, classrooms, nursery, lobby, bookstore, infant’s room, and toddler’s room on the first floor. The second floor includes a fitness room and various classrooms. The existing Chapel and multi-purpose buildings will have limited renovations to mechanical and electrical spaces.

Prince of Peace Baptist Church

The project consists of an 18,000 square foot pre-engineered one story church building including a 400-seat worship space, full commercial kitchen, offices, classrooms, and attached garage. This project is located in Lansing, Michigan.

Brighton Nazarene Church - Additions & Renovations

The project includes a new 17,600 square foot addition to the existing 20,860 square foot church. Additions include a 520-seat worship space, choir room, toilet rooms and space roughed-in for a future balcony.

Immanuel Lutheran Church

Project is an 11,500 square foot one story church with a terrace level located in Big Rapids, Michigan. Facility includes sanctuary, fellowship hall, small office area, multipurpose room and music room.

Queen’s Church

Project consisted of renovations to the school and replacement of the heating system in the Church located in Jackson, Michigan. Elevators were added to the school along with upgrades to the steam boiler system. The Church steam heating system was replaced with new hot water boilers, piping, and terminal heating equipment.

St. Patrick Parish

Project included renovations to 45,000 square feet of school and 9,000 square feet of Church area in Portland, Michigan. The central plant steam system was replaced with a new hot water boiler system with provisions for future cooling for both the school and Church. New terminal equipment and air handling units where installed along with a building automation system.