Back to top

Ionia Prison

Project consisted of design and project management for the Video Management & Perimeter Surveillance Enhancements Project including replacement of the existing perimeter light fixtures with LED fixtures, added security cameras, security racks, security control system cabinets and infrastructure wiring throughout facility.

Mason Building

Steven T Mason Building project consists of renovating an eight story building plus basement area that is approximately 253,000 square feet gross area. The HVAC, plumbing, electrical, and fire protection design consisted of evaluating the existing systems to determine the condition of the associated equipment. The mechanical and electrical systems were replaced and upgraded both due condition age and also to assist in achieving LEED silver. The design was performed in Revit with clash detection performed and adjusted as needed. Total Construction value was approximately $30,000,000.

Dart 5 Phase 3

Project consists of designing a new 150,000 square foot office space inside an existing warehouse. The project included complete new mechanical heating, cooling, ventilation, kitchen, plumbing, lighting, power, and emergency generator. The design was performed in Revit with clash detection performed and adjusted as needed.