Ionia Correctional Facility

Project includes completely removing the existing steam HVAC system for nine buildings totaling 295,000 square feet, removing buildings from the central steam plant and installing hot water heating boilers and domestic hot water systems for most of the buildings.  Gas fired equipment will be added to one building. Design includes new mechanical and electrical infrastructure to install new energy efficient systems.

Dart Container - Building 5 Office

Project consists of designing a new 150,000 square foot office space inside an existing warehouse.  The project included complete new mechanical heating, cooling, ventilation, kitchen, plumbing, lighting, power, and emergency generator.  The design was performed with clash detection and adjusted as needed.